Japan New Metals tungsten hydrometallurgical refining facilities in Japan

  • JPJapan
  • prj-jp-japan-new-metals-tungsten

Latest financing-row activity reportNo physical status recorded

Download investigation JSONLast revised

Location
日本国内JP
Stages
Refining
Materials
TungstenTracked materials only
Co-investment
Public capital and a designation

What does the record establish?

This registered undertaking is linked below to its financial instruments, policy context and available industrial evidence.

Financial standing

1 directly linked instruments. Recorded financial states: Announced. A commitment, a payment and a project cost remain separate.

Inspect instruments and terms

Legal and policy context

1 parent policy actions; 1 project designations. Designation confers standing, not finance. Material and stage overlaps with controls do not establish a restriction on this project.

Read the policy actions

Industrial evidence

No source-reviewed project milestone is published in this corpus. Financing entries may still contain attributed activity reports; this gap does not establish inactivity.

See evidence gaps

Financial evidence and chronology

Each instrument keeps its own financial history. These dates describe financial states, not construction or production. Amounts are the current recorded terms, not historical amounts at every date below.

Grant · Japan Organization for Metals and Energy Security (JOGMEC)※助成額は約20億円 · Announced · Commitment
Recipient
日本新金属株式会社Japan New Metals Co., Ltd.
Legal authority as stated
経済安全保障推進法 (Economic Security Promotion Act)
  1. · Announced

    METI's list gives the subsidy with the plan certified on 令和8年9月7日; JOGMEC's list of grant decisions, as read, does not yet include it.

    経済産業省 (Ministry of Economy, Trade and Industry, Japan)

Source-stated terms

The amount is approximate as both lists print it (約, "about"); the yen figure is 億円 × 100,000,000.

Full financial instrument, conditions and field-level evidence

Capital stack

One layer per value role. Public commitments and joint-vehicle capital are reported separately by currency. Other categories appear individually.

Public commitments

1 row, summed per currency

Committed to a recipient by a government or public enterprise, at the status each row states. A contracted, partially disbursed or disbursed row is binding because an agreement is executed; payment is tracked separately by status. A contracted row need not mean funds are obligated or paid, and a partially disbursed row is not fully paid. Summed per currency and per instrument, never across either; a part is never added to its package.

JPY

Grant1 row

Not yet binding

Approximately
2 billion

1 counted

  • 日本新金属株式会社

    Expanded tungsten hydrometallurgical refining facilities in Japan.

    aboutJPY2 billionAnnounced7 Sep 2026
    Providing government
    JP
    Value role
    Commitment
    Instrument
    Grant
    Capital source
    Public
    Supply-chain stages
    Refining
    Coding note
    Ambiguity noted

Source-reviewed industrial observations

This undertaking currently lacks a published source-reviewed industrial milestone. Any activity described in financing entries remains attributed to its publisher. Its operational status requires further source review.

Policy context

These policy actions directly parent the project's finance or designation entries. Their presence does not establish a causal effect on industrial activity.

Designations

Scheme recognition records standing; capital support requires a separate financial instrument.

Control clauses on the same materials and stages

Clauses whose covered items share a material and a supply-chain stage with this project, with their legal status on 12 Nov 2026. The overlap is a shared material and stage; project-level effects require separate evidence.

  • Export licensing, Item 1

    MOFCOM/GACC Announcement No. 10 (2025)

    CNRefining

    In force

What remains unknown

Gaps describe what Stratellar has documented. They do not establish that an activity did not occur.

  • No project-native source-reviewed industrial milestone is published. Attributed activity in financing histories remains a separate evidence class; no exact milestone date or facility-wide conclusion is inferred.
  • Historical amount review is incomplete. Current amounts cannot be read as a time series of earlier commitments.
  • Structural links and shared materials do not demonstrate that a government measure caused an industrial outcome.

Evidence

  1. 重要鉱物(経済安全保障推進法に基づく認定供給確保計画)

    経済産業省 (Ministry of Economy, Trade and Industry, Japan)

    Fields supported
    Name · Sponsors · Materials · Location
    Evidence level
    Explicit
    Location in document
    Section 4, plan 2026重要鉱物第3号-1
    Qualification
    "日本国内に、タングステンの湿式精錬設備を増強し、国内安定供給体制を強化する。"
    View source dossier
  2. 重要鉱物(経済安全保障推進法に基づく認定供給確保計画)

    経済産業省 (Ministry of Economy, Trade and Industry, Japan)

    Fields supported
    Supply-chain stages
    Evidence level
    Ambiguous
    Location in document
    Section 4, plan 2026重要鉱物第3号-1
    Qualification
    湿式精錬 (hydrometallurgical refining) is coded as refining.
    View source dossier

For citations, open a parent policy action for BibTeX, RIS and CSL formats. Cite original documents for claims about government action.